KUMKANG Life Science commits its best endeavors into providing 
its customers with convenient and sound places of sleeping based on
professionalism to be the best in the industry with continuous creativity and passion.

  • Home>
  • Product>
  • Electric boiler

Electric boiler

How to install floor panel and electric boiler

Installing Styrofoam panel

  • Remove foreign substances and keep the floor clean, and then install the Styrofoam panels.
  • Prefab Styrofoam panels (1.5T) are designed to provide paths of PVC hoses; very simple and easy to install.
  • The finished edges or area to be fixed shall only be fixed with adhesive tape.
  • * Cut the Styrofoam panel to adequate size on the corners or into a non-standard shape.

Installing Styrofoam panel

Installing heat dissipation plates on the floor

  • Install the prefab heat dissipation plate (SGL steel sheet, 0.5%) on the Styrofoam panels (1.5%) one by one.
  • Do not install the heat dissipation plates on round-finished corners.

Installing heat dissipation plates on the floor

Installing PVC hose (10ø)

  • Insert the PVC hoses into the rolls on the groove of the hot water panels. Clear distinction shall be made between the inlet hose and outlet hose.
  • The PVC hose (10ø) is very flexible and very easy to connect on bended sections.
  • Never make connection between the hoses.

Installing PVC hose (10ø)

Installing cover of the heat dissipation plate

  • The heat dissipation plate cover is excellent in heat transfer (heat conductivity) and heat storage (thermal storage function) to reduce energy consumption.
  • Installing covers of standard size tightly to each other ensures finishing.
  • You can cut the cover for finishing non-standard areas.
  • Installing the heat dissipation plates (function of flat stone for hypocaust) completes the installation work.

Installing cover of the heat dissipation plate

Work on connections of electric boiler

  • Insert the PVC hose (10ø) for hot water into the bottom of the electric boiler, and then fasten the connection.
  • Connect the plug to the receptacle and fill the water tank of the boiler with water.
  • By supplying water to the electric boiler until the warning indicator is turned off, installation of the boiler is completed.

Work on connections of electric boiler

Installing interior materials

  • Any interior materials are allowed for finishing.
  • (e.g., floor covering, deco-time and reinforced flooring) Floor covering is laid on the heat dissipation plate cover.
  • Finishing the floor covering completes installation.
  • Now, all of the installing procedures are completed.

Installing interior materials